Mechanical, Electrical, Plumbing (MEP) in Construction Contract

The acronym MEP became an integral word of a building project in Middle East Gulf region during year 2000. In the inception stage of MEP, there were involvement of only two engineering branches, Mechanical and Electrical, now it included electronics, instrumentation and communication. In some occasions, Mechatronics also partake in the project for smooth completion of the whole MEP works. Companies that carry out MEP works also known as Electro-Mechanical company which has multi-faceted technicians and engineers for effective design, coordination and execution of the works.

Method Statement For The Installation Of Power and Lighting System Wiring

This method of statement specifies the detailed requirements and procedures for the installation of Power and Lighting System Wiring. Installation: No wiring be carried out until the appropriate tests required or in the electrical testing section have been done and the consultant has given his clearance for wiring to commence. A loop in form of wiring shall be used as far as practicable or unless otherwise indicated. Joints in conductors shall be made using insulated terminal blocks complying with requirements of this specification.

Typical Cable Laying Details For Direct Buried, Low Tension Cables

Most Construction projects requires underground cabling system for its power supply, some times High tension system too. The architects and builders are least bothered about how this cables routed to the premises and equipment. If electrical professionals pointed out the feasibility, the aesthetics of the project would touch to the intended level. Hence, in the planning stage itself the routes and size of the power cable trench to be incorporated in the project design.

Method of Lightning Protection System For Building

Lightning Protection System should be in accordance with BS 6651 and IEC 61024 to protect the building structure and personnel from the risk of a lightning strike. The installation shall comprise air networks connected to roof and down conductors and finally terminated in earth electrodes, via structural re-bars and suitable test points in accordance with the details included on the attached drawings or in the Specification Section.

Automatic Transfer Switch (ATS) OR Automatic Mains Failure (AMF) Panel

Reliable electrical power becomes one of the most wanted factor in modern world industry where operation should be uninterruptible and maximize the cycle of operation, output quality and to avoid losses and damages. Here we are talking about Automatic Transfer Switches (ATS) also known as Automatic Mains Failure (AMF) panel to cater uninterrupted power supply from Mains or backup sources like Diesel gen-set, static ups etc.

Conduit Wiring In Electrical Construction Contract Works

Scope of Work of this this sample specification covers the supply, installation, testing and commissioning of all wiring materials for power and lighting in concealed and/or surface conduits.

1. Applicable Standards

The conduits shall conform to IS 9537 I & II  or equivalent standards. Switches, Plug Sockets shall conform to IS 3854 and IS 4615, however, contractor shall comply with the latest or superseded versions of IS/BIS to be used for the complete work.

Method of Earthing or Grounding for Diesel Generator Plant

Earthing or Grounding of Diesel Generator Plant is important to ensure correct operation of the plant and safety of the people who work over there. Generator neutral (star point) is to be connected by insulated earthing conductor through the neutral earthing link or device to main earthing bar. Neutral earthing conductor is to be suitably sized to carry maximum earth fault current for time it takes the system protection to operate with final conductor temperature not exceeding 160 deg. C, but not less than 30 mm2 per 100 kVA of generator rating, with a minimum of 50 mm2. All emergency power diesel gensets including portable gensets to be connected to grounding conductor.

Importance of Fire Alarm System

Fire alarm systems have become increasingly sophisticated and functionally more capable and reliable in recent years. They are designed to fulfill two general requirements: protection of property and assets and protection of life. As a result of state and local codes, the life-safety aspect of fire protection has become a major factor in the last two decades.

Method of Clean Earthing or Grounding in Electrical System

Clean earth grounding or low noise earth shall be provided as required, to ensure that the level of induced or conducted interference from external sources, including the facility power grounding system, does not produce incidence of malfunction of the equipment, which is unacceptable for the operating system.

Earthing or Grounding Method For Transformer Substation

MV switchgear and MV cables are to have separate main earthing bar connected to framework or earth bar of each item by insulated conductor and the earth-electrode by 2 insulated earthing conductors, one at each end of bar, via testing joints. Earthing conductor is to be minimum 150 mm2.

Method Statement For Installation Of Galvanized Conduits On Exposed Surface

Method Statement For Installation Of Galvanized Conduits that has to be installed on the Exposed Surface of a building is described here. This method of statement specify the detailed requirements and procedures for the installation of Galvanized Conduits for the exposed surface installation requirement for MEP services of the above building.

Fire Alarm System In Electrical Construction Works

Fire Alarm System installation work covered by this section of the specifications includes the furnishing of all labor, equipment, materials, and performance of all operations in connection with the whole Fire Alarm System as shown on the drawings and as herein specified. The requirements of the conditions of the Contract, Supplementary Conditions and General Requirements apply to the work specified in this section.

Master Antenna TV System (MATV) In Electrical Construction Works

Master Antenna Television or MATV means many TV connection outlets from one Master antenna control system. Usually high-rise apartment houses, hotels, schools and cluster based residential area utilizes this kind of TV distribution network. It may or may not include FM radio so that one outlet can receive both TV and FM reception. The scope of this section covers the design, supply, installation, testing and commissioning of Master Antenna TV System, for the reception and distribution of television broadcast signals.

Air Conditioning And Ventilation Installations in MEP

In this sample MEP specification section, Air Conditioning And Ventilation Installations have been described in detail under construction contract work. All individual components of packaged air handling units shall comply with the appropriate Sections of this Specification unless otherwise specified within the Schedules or on the drawings.

Value Engineering and Its Importance In Engineering Industry

The value is a function of cost. Therefore, it can be increased either by improving the function or reducing cost. The maximum value is achieved when the function performs reliably at the lowest cost. A key principle of value engineering that basic functions be preserved and not reduced as a result of improvements in value. Thus Value Engineering (VE) is a systematic method to improve the "value" of goods, products or services through an examination of the function.

Conditions Of Sub-Contract Agreement In Construction

Occasionally Main Contractor of the construction work depends sub-contractor for accomplishing some smaller or part of the project that may require specialized technical know-how and installation methods. In those cases Main contractor selects some sub-contractors who has capacity to achieve the task within the given time frame. Hence both of the parties, ie., Main contractor and Sub-contractor to be signed an agreement which protects both the parties' interest. Here is a sample for Conditions of Sub-contract Agreement in Construction Works.

Low Voltage (LV) Switchgears in Electrical Construction Works

Low Voltage Switchgear are familiar to every people since they are the controlling mediators between low voltage utilities and equipment with human beings. Be it a common home DB or an isolator or control centres, they all are being manufactured to use untrained people ie., common people. The scope of works shall cover the supply installation, testing and commissioning of main and sub-distribution boards, panel boards, fusible safety switches, circuit breakers etc. Associated minor building works require for the erection of the distribution boards and panels shall be included in the scope of work.

 

Typical Installation Details Of Floor / Wall Mounted Electrical SMDB

Electrical Sub-Main Distribution Boards (SMDB) are the integral part of Electrical LV Power distribution network in the end user premises of a medium and large scale projects. SMDB acts as a mediator between Main Distribution Board (MDB) and Final Distribution Boards (FDB) that serves approximately 100A to 400A load range. The drawings given here shows how to install: