Method of Lightning Protection System For Building

Comply with the General Conditions, Supplementary Conditions and the requirements in various Sections of the Electrical Specification. In addition read and conform to all Electrical Sections of these specifications. The installation shall comprise air networks connected to roof and down conductors and finally terminated in earth electrodes, via structural re-bars and suitable test points in accordance with the details included on the attached drawings or in the Specification Section.

Method Statement in Construction Contracts

Every project is unique, in particular, construction projects. There are many methods applied to accomplish functioning of individual installations included in the whole project. Building services like Mechanical, Electric, and Plumbing (MEP) work have given more importance than other disciplines dealt with. It's because of complexity and alternate methods available to accomplish the same output. While executing individual installations - also known as tasks - construction team have to adopt suitable methods submitted as an integral part of Tender. Most of the project managers or representatives of client keen to look Method Statement of critical and important tasks. We will look into what is Method Statement and what is the importance a Method Statement brings to a construction project.

Conduit Wiring In Electrical Construction Contract Works

Scope of Work of this this sample specification covers the supply, installation, testing and commissioning of all wiring materials for power and lighting in concealed and/or surface conduits.

1. Applicable Standards

The conduits shall conform to IS 9537 I & II  or equivalent standards. Switches, Plug Sockets shall conform to IS 3854 and IS 4615, however, contractor shall comply with the latest or superseded versions of IS/BIS to be used for the complete work.

Electrodes for Earthing or Grounding System in Building Construction

A. Ground Rod:

16 mm diameter stainless steel. Driving head is to be high strength steel. Couplings are to be long length silicon bronze, internally threaded. Threads are to be rolled onto rod to ensure uniform layers of copper and strength. Earth rod is to be complete with non-corrosive couplings, head and bolted connector of sufficient size, and number of bolted clamps to connect all cables terminated thereto.

Conditions Of Sub-Contract Agreement In Construction

Occasionally Main Contractor of the construction work depends sub-contractor for accomplishing some smaller or part of the project that may require specialized technical know-how and installation methods. In those cases Main contractor selects some sub-contractors who has capacity to achieve the task within the given time frame. Hence both of the parties, ie., Main contractor and Sub-contractor to be signed an agreement which protects both the parties' interest. Here is a sample for Conditions of Sub-contract Agreement in Construction Works.

Construction Specification For Electrical Busbar Trunking (Bus Duct) System

Busbar Trunking System (BBT) in electrical construction, uses to transporting electrical power to a shorter distance but many utilization point, say, within the building or a compound of facilities. Though cables can also be used in these areas, their economic impact would be high if compared to the effective Busbar Trunking System. It will help us to tap power directly from where we want it to be and make utilize to the service point.

Typical Installation Details and Drawings

Construction projects highly depends on typical installation details and drawings. Architects and engineers use this kind of information to reduce their work load. Employees particularly technicians and foremen who execute the project uses typical drawings as general guidelines where repeated structure, forms, shapes, operations, loads, etc. come into force.

Earthing or Grounding Method For Transformer Substation

MV switchgear and MV cables are to have separate main earthing bar connected to framework or earth bar of each item by insulated conductor and the earth-electrode by 2 insulated earthing conductors, one at each end of bar, via testing joints. Earthing conductor is to be minimum 150 mm2.

Payment Application Format For Construction Companies

Construction companies normally submit Payment application every month as per the contract agreement. Until completion of the project, they get part payment from their client after submission of claim which is duly approved and certified by project consultant. Project QS collect all the relevant work details and progress percentage from the field engineers in close coordination with Project Manager.

Medium Voltage Cables (MV Cables) In Electrical Construction

The contractor shall supply, install, test and commission the 13.8 KV cable network as shown and indicated on the contract documents. Conductor sizes shall be metric as shown, conductor sizes with cross sectional areas smaller than specified will not be accepted. The cable installation shall include all trench work, sleeves, ducts, and all necessary fixings and cable terminations at both ends of the cable. The contractor shall supply and install cable marker posts to indicate the route of all underground cables. Markers shall be provided at every bend along the route and at sites of crossing roads or pipe lines.

Advantages of WiMAX Broadband - Long Distance Wireless Technology

WiMAX Broadband Internet is an IP based Wireless Broadband Access Technology utilizing IEEE 802.16e-2005 standard as the air interface. WiMAX will provide broadband connectivity anywhere, anytime, for any device and on any network. WiMAX is a unique technology being deployed by BSNL for the first time in India.

Requirements of Diesel Genset Plant in Building Services

Modern Buildings essentially implement the needs of Diesel Powered Electricity Generation Plant. It would become an integral part of the building the day building occupied by its tenants. Here we look into what are the objectives, specifications, services to be considered for functioning complete Diesel Powered Electricity Generation Plant installed in a commercial Building.

Method of Earthing or Grounding Of MDB, Panel Boards, Lighting And Wiring Installations

Method of Earthing To Main Distribution Board (MDB)

Main earthing bar is to be provided in main distribution room and connected to earth electrode by 2 insulated conductors (minimum 150 mm2) via testing joints. Earthing bars of main distribution boards are to be connected, by insulated earthing conductor, directly to main earthing bar at main distribution room.

Security and Access Control Systems (SACS) for Critical Security Areas

Special areas like Airports, Port Trusts, Naval Base, Military base, Telecom buildings, Refinery, Petroleum handling areas etc. needed highly sophisticated security and access control system. It provides safety and security for both men and equipment the area handling. Here is the specification and installation methods for SACS.

High Voltage and Low Voltage Power Cables In Electrical Construction

This article explains electrical power cables used in construction works complete with supply, installation, testing and commissioning of High Voltage (HV) and Low Voltage (LV) cables. All cables shall conform to standards of IS 7098-1973, IS 1554-1976 and wiring cables to IS 694-1977 however, contractor shall comply with the latest or superseded versions of IS/BIS to be used for the complete work.

Fire Alarm System In Electrical Construction Works

Fire Alarm System installation work covered by this section of the specifications includes the furnishing of all labor, equipment, materials, and performance of all operations in connection with the whole Fire Alarm System as shown on the drawings and as herein specified. The requirements of the conditions of the Contract, Supplementary Conditions and General Requirements apply to the work specified in this section.