Medium Voltage Cables (MV Cables) In Electrical Construction

The contractor shall supply, install, test and commission the 13.8 KV cable network as shown and indicated on the contract documents. Conductor sizes shall be metric as shown, conductor sizes with cross sectional areas smaller than specified will not be accepted. The cable installation shall include all trench work, sleeves, ducts, and all necessary fixings and cable terminations at both ends of the cable. The contractor shall supply and install cable marker posts to indicate the route of all underground cables. Markers shall be provided at every bend along the route and at sites of crossing roads or pipe lines.

Logic Families in Digital Electronics - TTL, CMOS, and ECL

Digital Integrated circuits are produced using several different circuit configurations and production technologies. Each such approach is called a specific logic family. A logic family is a collection of different integrated circuit chips that have similar input, output, and internal circuit characteristics, but they perform different logic gate functions such as AND, OR, NOT, etc. The idea is that different logic gate functions, when fabricated in the form of an integrated circuit with the same approach, or which belongs to the same logic family, will have identical electrical characteristics (electrically compatible with each other).

Advantages of WiMAX Broadband - Long Distance Wireless Technology

WiMAX Broadband Internet is an IP based Wireless Broadband Access Technology utilizing IEEE 802.16e-2005 standard as the air interface. WiMAX will provide broadband connectivity anywhere, anytime, for any device and on any network. WiMAX is a unique technology being deployed by BSNL for the first time in India.

Conditions Of Sub-Contract Agreement In Construction

Occasionally Main Contractor of the construction work depends sub-contractor for accomplishing some smaller or part of the project that may require specialized technical know-how and installation methods. In those cases Main contractor selects some sub-contractors who has capacity to achieve the task within the given time frame. Hence both of the parties, ie., Main contractor and Sub-contractor to be signed an agreement which protects both the parties' interest. Here is a sample for Conditions of Sub-contract Agreement in Construction Works.

Security and Access Control Systems (SACS) for Critical Security Areas

Special areas like Airports, Port Trusts, Naval Base, Military base, Telecom buildings, Refinery, Petroleum handling areas etc. needed highly sophisticated security and access control system. It provides safety and security for both men and equipment the area handling. Here is the specification and installation methods for SACS.

Guidelines for Installation of Emergency Power Diesel Generating Set

We often depends Diesel Electrical Genset as emergency power system due to mains failure. As a professional, the installation of diesel electrical power generator should be as per the clients requirement and to be inline with the authoritative norms and standards. Safety, security, convenience, future expansions etc are to be considered and co-ordinated before start detailing of the genset's installation. The generator should be as close to the main change-over board as possible. In cases like Textile Mills, where there is fear of smoke affecting the quality of the yarn etc., generators may be located away from the Plant / Department.

Typical Installation Details and Drawings

Construction projects highly depends on typical installation details and drawings. Architects and engineers use this kind of information to reduce their work load. Employees particularly technicians and foremen who execute the project uses typical drawings as general guidelines where repeated structure, forms, shapes, operations, loads, etc. come into force.

Method Statement in Construction Contracts

Every project is unique, in particular, construction projects. There are many methods applied to accomplish functioning of individual installations included in the whole project. Building services like Mechanical, Electric, and Plumbing (MEP) work have given more importance than other disciplines dealt with. It's because of complexity and alternate methods available to accomplish the same output. While executing individual installations - also known as tasks - construction team have to adopt suitable methods submitted as an integral part of Tender. Most of the project managers or representatives of client keen to look Method Statement of critical and important tasks. We will look into what is Method Statement and what is the importance a Method Statement brings to a construction project.

Definitions of Electrical Earthing / Grounding Terms

In electrical projects, both construction as well as maintenance, the following terms used on the Drawings, Specifications and in the actual Work site are equivalent and may be used interchangeably: "earth" and "ground"; "earthing" and "grounding". Besides, this article tries to rectify misinterpretation of some important terms often used by people involved in the electrical earthing / grounding work.

Installation of Structured Cabling For Voice / Data System In Building Construction

The Contractor shall design, supply and install outlet plates, conduits, trunking, trays, wiring, junction boxes, distribution frames, patch panels, data rack, backbone cables, etc. necessary to form a complete structured system for voice and data cabling within the buildings. Cabling / wiring shall be provided for voice system from patch panel location to each voice/data outlet. Draw wires shall be provided in conduits for future data cabling / wiring by others (if applicable). The installation shall comply with the requirements of ANSI / EIA / TIA-568-1991 as appropriate as well as Local Telecom Authority.

Electrical Engineering

Electrical engineering deals with practical applications involving current flow through conductors; focuses on the design, construction, and operation of electrical systems and equipment. It includes developing, producing and testing of electrical and electronic devices and equipment, such as, generators to produce and distribute electricity, electric motors and other electrical machinery, transmission line.

Fire Fighting Services in MEP Construction Contract

In this sample MEP specification section, Mechanical Fire Fighting Services have been described in detail under construction contract work. Main Highlights of this MEP Specification for Fire Fighting Services are: Pipework Generally, Dry Risers, Hose Reels, Fire Hydrants and Sprinkler Installation.

Construction Shop Drawings

Construction Shop drawings are the actual detail of all manufactured or fabricated items, indicate proper relation to adjoining work, amplify design details of equipment in proper relation to physical spaces in the structure, and incorporate minor changes of design or construction to suit actual conditions.

Connector Products And Accessories for Electrical Earthing or Grounding System

Connector Products And Accessories for Electrical Earthing or Grounding System shall be as follows: Copper or copper alloy, purpose made, of approved design, compatible with points of connection, and of adequate cross-section and current carrying capacity. Connections to metallic structures for earthing conductors and bonding conductors between electrically separate parts of a structure shall be either by direct exothermic welding or by bolting using a stud welded to the structure.

Engineering Drawing / Drafting

Drawing means lines, shapes, finishes, sizes and colour combined to construct objects or structures. It will be a cumbersome task when narrating an idea without drawing, if the idea is an object or structure. Engineering is heavily depending on drawings, since, technical drawing has developed a global language named Engineering Drawing, capable to express its objects and structure to everyone without the barrier of human languages. Engineering Drawings conveniently helps to explain and record an idea that can be smoothly conveyed to one person to other or sometimes to machine too.

Medium Voltage Distribution System In Electrical Construction

The work included within this section is for the supply, connection, testing and commissioning of 13.8 KV switch gears, cables, package sub station and all the related accessories necessary for the proper operation of the system as shown and described on drawings, bill of quantity and herein. The contractor shall coordinate with the other services (trades) involved in the project to insure that the foundation, are suitable for the equipment to be installed.

Typical Mounting Details Of Fire Alarm Break Glass Manual Call Point

These drawings show how to install Fire Alarm Break Glass (BG) or Manual Call Point (MCP) on walls. It has to be mounted on back box installed in the wall. This box (embedded or exposed as specified in the concerned section of the specification) has to be connected through GI / PVC conduit that will have the Firetuff or equivalent cable to be looped for other detectors.