Construction Project

Construction Quality Plan Of Building Project - Allocation Of Responsibilities

This section of Quality Plan identifies key personnel in the company concerned with the Quality plan and describes the responsibilities of these persons in relation to the system’s implementation. The project organization structure is set out in a chart form. The key staff with responsibilities in relation to quality are: Quality Assurance Manager, Project Manager, Discipline Engineer, Supervisors and Store man.

Construction Control Guidelines for Plot Access in Site Logistics

Prior to the commencement of construction on the Plot, any access or visitation to the Plot is restricted. Anyone requiring access and/or a visit to the Plot shall submit a request and obtain permission from the Master Developer's Project Manager. Any such permission will require a minimum of 24 hours notice period from the submission of the request.

Construction Quality Plan Of Building - Procurement Procedure

The discipline Engineer ensures that the Client Engineer’s approval has been obtained on the appropriate submittal form. The discipline Engineer shall check carefully that offered materials / Equipment are complying with the approved materials / Equipment as to makes, types, part Nos. and specs.

Construction Control Guidelines for Signboards in Site Logistics

The Plot Developer shall submit for approval any proposed signboard complete with details and specifications. The submission must include colour drawings of the signboard and provide illumination details. Sign board size, height, layout and details shall be as per the images shown in project documentation.

Construction Control Guidelines: How Plot Developers Perform Construction Survey

The Plot Developer shall verify all measurements and be responsible for their correctness. The datum will be to as per local authority. Regardless of the availability of any survey markers on the Site, the Plot Developer shall be responsible to perform his own survey and establish survey markers and/or verify the authenticity and accuracy of the existing survey markers.

Construction Control Guidelines for Insurance Requirements

The master developer and the Plot Developer are to reach an agreement through which the Plot Developer provides his own General Liability and Contractor's All Risk (CAR) Insurance to be established for that specific Plot to the satisfaction of the Master Developer.