Construction Quality Plan

Construction Quality Plan Of Building Project - Allocation Of Responsibilities

This section of Quality Plan identifies key personnel in the company concerned with the Quality plan and describes the responsibilities of these persons in relation to the system’s implementation. The project organization structure is set out in a chart form. The key staff with responsibilities in relation to quality are: Quality Assurance Manager, Project Manager, Discipline Engineer, Supervisors and Store man.

Construction Control Guidelines for Plot Access in Site Logistics

Construction Control Guidelines for Plot Access in Site Logistics

Prior to the commencement of construction on the Plot, any access or visitation to the Plot is restricted. Anyone requiring access and/or a visit to the Plot shall submit a request and obtain permission from the Master Developer's Project Manager. Any such permission will require a minimum of 24 hours notice period from the submission of the request.

Construction Control Guidelines for Signboards in Site Logistics

Construction Control Guidelines for Signboards in Site Logistics

The Plot Developer shall submit for approval any proposed signboard complete with details and specifications. The submission must include colour drawings of the signboard and provide illumination details. Sign board size, height, layout and details shall be as per the images shown in project documentation.

Construction Control Guidelines: How Plot Developers Perform Construction Survey

Construction Control Guidelines For Survey

The Plot Developer shall verify all measurements and be responsible for their correctness. The datum will be to as per local authority. Regardless of the availability of any survey markers on the Site, the Plot Developer shall be responsible to perform his own survey and establish survey markers and/or verify the authenticity and accuracy of the existing survey markers.

Construction Control Guidelines for Materials Delivery and Excess Material in Site Logistics

Construction Control Guidelines for Materials Delivery and Excess Material in Site Logistics

Material deliveries shall be planned to meet schedule and construction requirements. The Plot Developer shall conform to the procedures related to entry permits and authorization, as prescribed by the Master Developer or the Master Developer's Project Manager. Excess material resulting from clearing, stripping and excavation operations shall not be removed from the site without the consent of the Master Developer's Project Manager.

Construction Control Guidelines for Shoring And Underpinning in Site Logistics

Construction Control Guidelines for Shoring And Underpinning in Site Logistics

All shoring and removal of, and underpinning shall be approved by the Master Developer and must comply with the safety requirements of all relevant local and international standards. Remedial underpinning shall be performed where existing foundations are inadequate. Precautionary underpinning shall be performed where new construction adjacent to an existing structure requires deeper excavation.

Conditions Of Sub-Contract Agreement In Construction

Sub-contract Agreement Form
Occasionally Main Contractor of the construction work depends sub-contractor for accomplishing some smaller or part of the project that may require specialized technical know-how and installation methods. In those cases Main contractor selects some sub-contractors who has capacity to achieve the task within the given time frame. Hence both of the parties, ie., Main contractor and Sub-contractor to be signed an agreement which protects both the parties' interest. Here is a sample for Conditions of Sub-contract Agreement in Construction Works.

Quality Plan for Construction Projects

Construction Quality Plan for Building Projects
It is essential that services and systems in a building construction contract work are provided to conform to the requirements of the customer, and that the activities be effected as economically as practical. The achievement of these objectives is facilitated by setting up working procedures and practices, which collectively provide a Work Efficient, yet controlled operating environment.

Inspection And Test Methods for Building Constructions

Construction Site Inspection
Every building construction work shall be inspected and tested by the representative of the main contractor to keep their Quality Plan in force as detailed here: All the installations will have a unique reference for the purpose of inspection/testing methods; It will be a condition in the purchase order, that wherever necessary individual sub-contractors will prepare inspection and test plans appropriate to their work activities.

Construction Quality Plan Of Building Projects- Procedures And Work Instructions

The company standard procedures will be implemented for the project however should a situation arise where this may be detrimental to the project or where an improvement could be made to a standard procedure the Project Manager shall be notified. With agreement of the Quality Assurance Manager a project procedure may be established and thus added to the Quality plan.