Construction Specification

Construction Quality Plan Of Building Project - Allocation Of Responsibilities

This section of Quality Plan identifies key personnel in the company concerned with the Quality plan and describes the responsibilities of these persons in relation to the system’s implementation. The project organization structure is set out in a chart form. The key staff with responsibilities in relation to quality are: Quality Assurance Manager, Project Manager, Discipline Engineer, Supervisors and Store man.

Construction Control Guidelines for Materials Delivery and Excess Material in Site Logistics

Construction Control Guidelines for Materials Delivery and Excess Material in Site Logistics

Material deliveries shall be planned to meet schedule and construction requirements. The Plot Developer shall conform to the procedures related to entry permits and authorization, as prescribed by the Master Developer or the Master Developer's Project Manager. Excess material resulting from clearing, stripping and excavation operations shall not be removed from the site without the consent of the Master Developer's Project Manager.

Method Statement in Construction Contracts

Method Statement in Construction Contracts

Every project is unique, in particular, construction projects. There are many methods applied to accomplish functioning of individual installations included in the whole project. Building services like Mechanical, Electric, and Plumbing (MEP) work have given more importance than other disciplines dealt with. It's because of complexity and alternate methods available to accomplish the same output. While executing individual installations - also known as tasks - construction team have to adopt suitable methods submitted as an integral part of Tender.

Mechanical, Electrical, Plumbing (MEP) in Construction Contract

MEP Works

The acronym MEP became an integral word of a building project in Middle East Gulf region during year 2000. In the inception stage of MEP, there were involvement of only two engineering branches, Mechanical and Electrical, now it included electronics, instrumentation and communication. In some occasions, Mechatronics also partake in the project for smooth completion of the whole MEP works. Companies that carry out MEP works also known as Electro-Mechanical company which has multi-faceted technicians and engineers for effective design, coordination and execution of the works.

Mechanical General Plant and Machines in MEP Work

MEP Specification drawing for Mechanical Pumping chanmber typical installation details
In this sample MEP specification section, Mechanical General Plant and Machines have been described in detail under construction contract work. Main Highlights of this MEP Specification are: Circulating Pumps, Water Storage Tank, Water Level Indication, Immersion Heaters for Hot Water Services, Direct Electric Water Heaters, and Expansion Vessels.

General Conditions And Requirements in Electrical Construction Contract

Electrical Construction Contract Drawing
A sample Specification for Electrical Construction Contract Works that describes General Conditions And Requirements to accomplish electrical works all in conjunction with Architectural, Civil, Mechanical and other services. All electrical equipment, materials, installation and workmanship shall comply with the latest edition of the applicable codes and standards of any of these organization listed below:

Mechanical Ductwork, Grilles And Diffusers

MEP Mechanical Specification - ductwork support drawing
In this sample MEP specification section, Mechanical Ductwork, Grilles And Diffusers have been described in detail under construction contract work. Main Highlights of this MEP Specification are: Mechanical Ductwork, Mechanical Ductwork Supports, Mechanical Dampers - General Requirements, Flexible Joints for Mechanical Ductwork, Air Intakes and Outlets, Kitchen Extract Canopies, Kitchen Extract Air Ductwork, Access Doors, Ductwork Test Points, Ductwork Protection, Grilles, Diffusers, Sand Trap Louvers, Air Valves, and Fire Dampers.

Conduit Wiring In Electrical Construction Contract Works

Electrical Power Layout Conduit Installation

Scope of Work of this this sample specification covers the supply, installation, testing and commissioning of all wiring materials for power and lighting in concealed and/or surface conduits.

1. Applicable Standards

The conduits shall conform to IS 9537 I & II  or equivalent standards. Switches, Plug Sockets shall conform to IS 3854 and IS 4615, however, contractor shall comply with the latest or superseded versions of IS/BIS to be used for the complete work.

Subscribe to RSS - Construction Specification