Lighting System

Technical Submittals of Materials / Equipment Approval for External, Exterior and Outdoor Lighting System

Technical Submittals of Materials / Equipment Approval for External, Exterior and Outdoor Lighting System

Technical Submittals of Materials / Equipment Approval for External, Exterior and Outdoor Lighting System consists equipment data, compliance statements, shop drawings or construction drawings, samples, product certificates, field test reports, maintenance data and as-built (record) drawings.

Construction Method of External, Exterior and Outdoor Lighting System

External, Exterior and Outdoor Lighting System

External, Exterior and Outdoor Lighting System includes lighting units with luminaires, lamps, ballasts, poles / support structures, and accessories and related power distribution and control, protective earthing and related builder's work including column foundations, cable pits, cable trenches and ductwork.

Method Statement For The Installation Of Power and Lighting System Wiring

Electrical Power and Lighting System Wiring

This method of statement specifies the detailed requirements and procedures for the installation of Power and Lighting System Wiring. Installation: No wiring be carried out until the appropriate tests required or in the electrical testing section have been done and the consultant has given his clearance for wiring to commence. A loop in form of wiring shall be used as far as practicable or unless otherwise indicated. Joints in conductors shall be made using insulated terminal blocks complying with requirements of this specification.

Electrical Earthing or Grounding Method for Road Lighting

Earthing Cables: Separate protective earthing cables for lighting column circuits are to be run with power circuit, terminated at LV supply position in lighting control panel and looped into column earthing terminals. The last column is to be bonded via an earthing bolt to a single 16 mm diameter stainless steel rod, 3.6 m long, driven into ground adjacent to column. Bonding is to be 16 mm2 stranded bare copper conductor.

Methods of Installing External, Exterior and Outdoor Lighting System

External or Exterior lighting system
Installation Methods of External, Exterior and Outdoor Lighting System includes lighting equipment luminaires, control gears, panel boards, poles, brackets, cabling, and allied minor civil works. All installations are to be carried out under strict supervision of qualified supervisors and engineers. If installation required heavy vehicles, extreme care has to be taken for preventing damages of lighting equipment, control gears and poles.

Method of Earthing or Grounding Of MDB, Panel Boards, Lighting And Wiring Installations

Method of Earthing or Grounding Of MDB, Panel Boards, Lighting And Wiring Installations
Main earthing bar is to be provided in main distribution room and connected to earth electrode by 2 insulated conductors (minimum 150 mm2) via testing joints. Earthing bars of main distribution boards are to be connected, by insulated earthing conductor, directly to main earthing bar at main distribution room.

Lighting Distribution Boards (LDB) In Electrical Construction Works

Lighting Distribution Boards In Electrical Construction Works
Lighting Distribution Boards are an integral and essential part of every building project and it must be designed, manufactured and installed all in accordance with the safety standards. In most of the cases it operates a layman wherein others operate dedicated or trained person. This article explains what are the basic and essential standards, parts, frame to be applied for manufacturing and installation of lighting distribution boards in a building project.