Construction Control Guidelines for Materials Delivery and Excess Material in Site Logistics

Material deliveries shall be planned to meet schedule and construction requirements. The Plot Developer shall conform to the procedures related to entry permits and authorization, as prescribed by the Master Developer or the Master Developer's Project Manager. Excess material resulting from clearing, stripping and excavation operations shall not be removed from the site without the consent of the Master Developer's Project Manager.

Construction Control Guidelines

Construction Control Guidelines of project will help participants to establish right relationship with each other. It explains guidelines and minimum requirements that must be adhered to by developers for the duration of their construction activities. It can be listed as follows:

Construction Control Guidelines for Existing Services

The extent, position, size and type of utilities shown on the Drawings issued to the Plot Developer have been based on information extracted from the records of the various public utilities, service providers, Ministries and the Project survey and must be regarded as approximate only.

Quality Standards for Electrical Earthing or Grounding System in Building Constructions

Electrical Earthing or Grounding System for buildings to be carried out all in accordance with the international standards in conjunction with the local authority requirements and recommendations. Earthing standards and methods are highly depending on the nature of the utilities and equipment installed / used at the premises. Simple earthing system we provide to the domestic connections while complex systems are being used in the power stations and industries.